Description
-The Mavera Boutique complex is located in Basaksehir, the most developed area in European Istanbul.
- The airport metro is only 150 meters away, the Olympic station is 1 km away, 5 km from the TEM highway.
- It is 8 km from the Mall of Istanbul, which is about a 10-minute ride by car, and it is 15 km from the Venezia mall outlet.
-The complex is also 6 km away from the Botanic Park.
-The large Basaksehir Hospital is 6 km away , The private BHT clinic is 5 km away, the private Sulaiman Al Qanuni Hospital 6 km away.
- Ibn Khaldun University is 10 km away , The Altin Bas University is also 10 km away.
-  It is also very close to Istanbul American schools, Al Huda International Schools, and many international and local schools.
- Mavera Boutique is close to the Palace of Justice of the Basaksehir district.
- The Complex is a 40-minute drive from Istanbul International Airport, and a 20-minute drive from Ataturk Airport.

Property Details
  • Property Type: Apartments
  • Purpose: Accommodation, Investment
  • Payment Types: Cash / Installments
  • Available Rooms: 4.5 + 1, 4+1
  • Bathrooms: 2
  • Parking: 2
  • Available Areas: 195 - 212
  • Heating: Central
  • Delivery Date: October 2024
Payment Plan
Cash / Installment 50% + 11 Month TL
  • Interior Amenities
    • Air conditioning Air conditioning
    • Aluminum work Aluminum work
    • Balconies Balconies
    • Built-in Oven Built-in Oven
    • Cook Cook
    • Dishwasher Dishwasher
    • Fire alarm Fire alarm
    • Intercom Intercom
    • Smart home Smart home
    • Terrace Terrace
  • Exterior Amenities
    • 24/7 Security 24/7 Security
    • Basketball Court Basketball Court
    • Coffee Shop Coffee Shop
    • Fire Alarms Fire Alarms
    • Football Court Football Court
    • Generator Generator
    • Gym Gym
    • Indoor Swimming Pool Indoor Swimming Pool
    • Kids Parks & Playgrounds Kids Parks & Playgrounds
    • Market Market
    • Parking Parking
    • Sauna Sauna
    • Security Cameras Security Cameras
    • Smart Home Smart Home
    • Turkish Bath Turkish Bath
    • Visitors Auto park Visitors Auto park
    • Walking Terrace Walking Terrace
  • Available Transportation
    • Airport
    • Buses
    • Metro
    • TEM Highway
    • Train
SWOT Analysis
  • Strengths
    • Special location
    • Professional construction company
    • Wide spaces
    • Low number of apartments in the project
    • Fair price
  • Weaknesses
    • The area around the project is currently empty
    • High tension lines next to the project
  • Opportunities
    • Two under construction metro station
    • Under construction Tramway station
    • New park
    • Juridical building
    • Under construction project
  • Threats
    • Under construction project